Additions and extensions

Plumbing for home additions and extensions, connecting the new part of the house to the services that are already there.

A timber-framed extension at the back of a brick house, with a trench for new pipework

New work on an old house

An addition runs through the same stages as a new home, with one extra job: joining it to the house that’s already there.

What we do

  • Lay the drains for the new slab and connect them to the existing sewer and stormwater.
  • Run water, and gas where it’s needed, into the new rooms.
  • Come back to fit the fixtures once the room is finished.

Working with your builder

We work alongside the builder running the job, or directly with you if you’re managing the build yourself. Send us the plans and we’ll quote it.

Three visits, one plumber

The plumbing stages of a build, in the order they happen.

  1. Before the slab

    Drain stage

    We set out and lay the drains and the pipework that sits under the floor, with risers where each wet area will be.

  2. Once the frame is up

    Rough-in

    Water and gas pipework runs through the walls and is left capped at the right height for every fixture.

  3. After tiling and cabinetry

    Fit-off

    We come back to fit the taps, basins, toilets, baths and showers, and test the lot.

Questions about additions and extensions

Can you connect an extension to our existing plumbing?

Yes. Tying the new work in to the existing drains and water supply is part of the job. We'll look at what's there and tell you what it needs.

Need a quote for additions and extensions?

Call or text Ryan, or send the details through and we will come back to you with a quote.